| No | Year | Firms | Job Definition | Job Status |
| 1 | 2004 | ALARKO – AKFEN | Tüpraş İzmit Refinery DHRP Project Offside Area Isometrics Renovation | Completed |
| 2 | 2004 | BOZDAĞ Orman Ürünleri | System and Construction Design of Bozdağ Wood Heat Treatment Unit and Commissioning Works. | Completed |
| 3 | 2005 | GÖKPINAR İnşaat | Elmalı Belediyesi Local Market Roof Construction Design. | Completed |
| 4 | 2005 | HAVATEK A.Ş. | BP Fuel Additive Storage Tanks Design. | Completed |
| 5 | 2005 | İZMİR Mühendislik | Tüprag Uşak Kışladağ Gold Mine,500 and 850 M³ Water Tank Design. | Completed |
| 6 | 2005 | İZMİR Mühendislik | Didim Kapris Hotel Stage Illumination Construction Design. | Completed |
| 7 | 2005 | ÖZCAN Makina | Toyota Factory New Paint Line Detail Engineering. | Completed |
| 8 | 2005 | TEFİROM | İskenderun Demir Çelik Factory Natural Gas Overhead Pipeline Supporting Construction, Foundation and Piping Design. | Completed |
| 9 | 2006 | ANKARA Makine | Olive Washing Machine Detail Engineering. | Completed |
| 10 | 2006 | ATEK | Steel Construction Design of a Hotel Conference Hall. | Completed |
| 11 | 2006 | BİVA Mimarlık | Urla DIA-SA Supermarket Steel Construction Design and Supervision Works. | Completed |
| 12 | 2006 | ÇINAR İnşaat | Tüpraş İzmir Refinery 25 MW Co-Generating Steam Lines Pipe Supports and Pipe Rags Design. | Completed |
| 13 | 2006 | DENİZ TİCARET ODASI İzmir Branch | Sea-Clean Ship,Garbage Collecting Arms Design and Construction. | Completed |
| 14 | 2006 | İZMİR Mühendislik | Forum Bornova Cinema Halls Ramp Steel Construction Design. | Completed |
| 15 | 2006 | İZMİR Mühendislik | Tüprag Uşak Kışladağ Gold Mine, Phase I Costruction General Revision Works,Site Engineering Works . | Completed |
| 16 | 2006 | İZMİR Mühendislik | Tüprag Uşak Kışladağ Gold Mine,Truck Lime Silos (2x60 Ton) Design. | Completed |
| 17 | 2006 | KAR – EGE | Drawing Services. | Completed |
| 18 | 2006 | REMKO | Mavişehir Residences, Sales Office Steel Construction Design. | Completed |
| 19 | 2006 | TEKNO Ltd. | BP , Portable Scaffholding Design. | Completed |
| 20 | 2006 | TEKNOMAK | Coca-Cola Kemalpaşa Factory Cooling Lines Design. | Completed |
| 21 | 2006 | TOTAL | Unloading Pier, Foam Monitor Lines Design. | Completed |
| 22 | 2006 | TÜPRAG-ELDORADO GOLD Cooperation | Uşak Kışladağ Gold Mine, Construction Management,Mechanical and Structural Supervisin for Phase II Construction. | Completed |
| 23 | 2006 | TÜPRAG-ELDORADO GOLD Cooperation | Supervision Works. | Completed |
| 24 | 2006 | WESTFALIA Seperator | Milk Seperator Skid Drawing. | Completed |
| 25 | 2006 | WESTFALIA Seperator | Olive Oil Process Lines Design (for 6 Facilities). | Completed |
| 26 | 2006 | WESTFALIA Seperator | Olive Oil Process Installation Supervision (for 4 Facilities) | Completed |
| 27 | 2006 | WESTFALIA Seperator | Malaxer Design. | Completed |
| 28 | 2006 | WESTFALIA Seperator | Kütahya Waste Water Treatment Facilitiy Decantor Installation. | Completed |
| 29 | 2006 | YALÇIN & TÜRK | Mey İçki- Tekirdağ Factory Tank Maintenance Platforms Design. | Completed |
| 30 | 2007 | ARAT Endüstri Ltd. Şti. | HMC Stack and Platform Detail Engineering. | Completed |
| 31 | 2007 | BURKUT Su Teknolojileri | Coca Cola Kemalpaşa Facility Reverse-Osmosis System Piping Design. | Completed |
| 32 | 2007 | COATES LORILLEUX | Underground Solvent Storage Facility Design. | Completed |
| 33 | 2007 | ÇINAR İnşaat | Tüprag Uşak Kışladağ Gold Mine, Mine Truck Shop Building Preliminery Design. | Completed |
| 34 | 2007 | EGE PROJE | Entire Mechanical Design of Tariş Licensed Storage Project, Storage Tank Area. | Completed |
| 35 | 2007 | FERKOS Makine | Drawing Services. | Completed |
| 36 | 2007 | GEA Tuchenhagen | Drawing and Engineering Services. | Completed |
| 37 | 2007 | İNTEKAYSA | Mechanical and Process Design of Henkel Elmadağ Factory. | Completed |
| 38 | 2007 | İZMİR Mühendislik | Çaldağ Nickel Mine, Iron Removal Tanks Design. | Completed |
| 39 | 2007 | İZMİR Mühendislik | Çaldağ Nickel Mine, Crushing Plant Steel Works Detail Engineering. | Completed |
| 40 | 2007 | ISIMSAN | Preliminary Engineering of two Calsium Carbonate Tanks. | Completed |
| 41 | 2007 | KARKEY | Mechanical Design of Silopi Power Plant Unit 5. | Completed |
| 42 | 2007 | ORDİNAT İnşaat | Tüpraş İzmir Refinery 25 MW Co-Generating Off-Side Pipe Line Design. | Completed |
| 43 | 2007 | ORDİNAT İnşaat | Tüpraş İzmir Refinery On-Pier Steel Building Design. | Completed |
| 44 | 2007 | ORDİNAT İnşaat | POAŞ İzmir Facility, New Fire Fighting System,Fire Water and Foam Lines Design. | Completed |
| 45 | 2007 | ORDİNAT İnşaat | 2 X 30.000M3 Oxygenate Tanks Detail Engineering Works for Tüpraş İzmit Refinery. | Completed |
| 46 | 2007 | ORDİNAT İnşaat | Tüpraş İzmir Refinery New Product Storage Works Off-Side Piping Design. | Completed |
| 47 | 2007 | TEKNOKON | Tüpraş İzmir Refinery GSIP Project Steel Construction Detail Engineering. | Completed |
| 48 | 2007 | TOKAR | Tüpraş İzmir Refinery Two New Crude Oil Tank Piping Design. | Completed |
| 49 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Uşak Kışladağ Gold Mine, Stand-By Booster Pump Piping Design. | Completed |
| 50 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Uşak Kışladağ Gold Mine, Grizzly Design for Apron Feeder. | Completed |
| 51 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Uşak Kışladağ Gold Mine, Overland Conveyor Extension Design. | Completed |
| 52 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Uşak Kışladağ Gold Mine,Temprorary Pregnant Pond Piping Design. | Completed |
| 53 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Uşak Kışladağ Gold Mine, New Barren Pond Piping Design. | Completed |
| 54 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Well Pump 1 Manifold Design. | Completed |
| 55 | 2007 | TÜPRAG-ELDORADO GOLD Cooperation | Chute Design for Dust Collection System. | Completed |
| 56 | 2008 | 2A MONTEK Mühendislik | Blade Valve Stress Calculations for İskenderun Municipality Water Supply Project. | Completed |
| 57 | 2008 | AFA Prefabrik Beton A.Ş. | Mechanical Supervision Works for Henkel – Ankara Liquid Building Piping Works. | Completed |
| 58 | 2008 | COATES LORILLEUX | Supervision Works for Solvent Storage Facility Piping Works. | Completed |
| 59 | 2008 | COATES LORILLEUX | Varnish Tanks Design for Gebze Factory. | Completed |
| 60 | 2008 | COATES LORILLEUX | Oil Tanks Piping Design for Gebze Factory. | Completed |
| 61 | 2008 | ÇINAR İnşaat | Tüprag Uşak Kışladağ Gold Mine, Sedimentation Pond Water System Design. | Completed |
| 62 | 2008 | DENSAN Denizcilik | Sewage System Purification Unit Sea Discharge Piping Design. | Completed |
| 63 | 2008 | DMG DENİZ Mühendislik | Petkim Naptha and Fuel Oil Tanks Design. | Completed |
| 64 | 2008 | Deniz Teknolojisi Ltd. | 48 M Motor Boat Mold Design. | Completed |
| 65 | 2008 | GEMSAN | Oxygenate Day Tank Design for Tüpraş İzmit Refinery. | Completed |
| 66 | 2008 | İNOKSTEK | Conseptual Milk Pasteurization Design (P&ID) of Tire Milk Factory | Completed |
| 67 | 2008 | İNTEKAYSA | Powder Pril Line Design for Henkel – Ankara Factory. | Completed |
| 68 | 2008 | İNTEKAYSA | Percarbonate Silo Design for Henkel – Ankara Factory. | Completed |
| 69 | 2008 | İNTEKAYSA | Supervision Services. | Completed |
| 70 | 2008 | LUPAMAT – MAKSAŞ | 1M3 Air Tank Design and Fabrication As Per ASME Sec.VIII.. | Completed |
| 71 | 2008 | SİSTEMAS | Evaporator Stress Calculations and Detail Engineering Works. | Completed |
| 72 | 2008 | TARKİM | DME Unit Piping Design for M.Kemalpaşa Factory. | Completed |
| 73 | 2008 | TEKNOKON | Dust Collection System Screw Conveyor Resisting Structure Design for İskenderun Demir Çelik Factory. | Completed |
| 74 | 2008 | TÜPRAG-ELDORADO GOLD Cooperation | Collection and Distribution Piping for Cells 10 To 15. | Completed |
| 75 | 2008 | WESTFALIA Seperator | IDOSB Kavaleto Facility Design. | Completed |
| 76 | 2008 | WESTFALIA Seperator | Afyon TMO Alkaloid Factory Decantor Installation. | Completed |
| 77 | 2008 | WESTFALIA Seperator | WS 2000 , WS 4000 Malaxer Design Renovation. | Completed |
| 78 | 2009 | ATEŞ Çelik | POAŞ Aliağa – Loading and Unloading Terminal Facility Mechanical Design Works.(5 Tanks and İnterconnecting Piping for 45.000M3 Storage) | Completed |
| 79 | 2009 | ÇINAR İnşaat | Eldorado Gold - Tüprag Kışladağ Facility, Piping Stress Analyses for Leach Pad New Water Distribution Line. | Completed |
| 80 | 2009 | ÇINAR İnşaat | Eldorada Gold – Efem Çukuru Facility Main Water Distribution Line Design. | Completed |
| 81 | 2009 | ENDA Enerji | Egenda A.Ş. - Mechanical Design Supervision for Tuzla Geothermal Power Plant. | Completed |
| 82 | 2009 | HT Mühendislik | AKSA Energy Manisa Power Plant Steam Turbine System Steam Cycle and Related Utility Design. | Completed |
| 83 | 2009 | HT Mühendislik | Auxiliary Steam Generation System Piping Supports Design for Enerjisa Bandırma Power Plant. | Completed |
| 84 | 2009 | HT Mühendislik | New Combined Cycle Piping Stress Analyses for Cakmaktepe Power Plant. | Completed |
| 85 | 2009 | İNOKSTEK | Conseptual Milk Pasteurization Design (P&ID) of Kosova Milk Factory | Completed |
| 86 | 2009 | ORDİNAT İnşaat | EÜAŞ Ambarlı Power Plant, 600M3 Deminaralized and 600M3 Filtred Water Tank Design. | Completed |
| 87 | 2009 | SEÇ İnşaat | Magnesite Transfer Tank Pressure Vessel Calculations(As Per AD2000). | Completed |
| 88 | 2009 | SUN Chemical | Varnish Tanks and Piping Design for Gebze Factory. | Completed |
| 89 | 2009 | TERBAY | Sludge Consolidation Tanks design for Eldorado Gold – Efem Çukuru Facility. | Completed |
| 90 | 2009 | WESTFALIA Seperator | Afyon TMO Alkoloid Factory Seperator Installation. | Completed |
| 91 | 2009 | WESTFALIA Seperator | Afyon TMO Alkoloid Factory New Extraction Units Piping Design. | Completed |
| 92 | 2009 | WESTFALIA Seperator | Dalyan Munucipal Water Treatment Plant Seperator Installation Supervision. | Completed |
| 93 | 2010 | AKSA Enerji | AKSA Energy Cyprus Power Plant,Combined Cycle Mechanical Design. | Completed |
| 94 | 2010 | ARDA Mühendislik | Batman Oil Refinery, H-100 Plant Unit's Piping As-Builts. | Completed |
| 95 | 2010 | ALP MER Makine | Poaş Aliağa Terminal LPG Pipe Line Piping Design. | Completed |
| 96 | 2010 | ARK İnşaat | İzmir Tüpraş Refinery, 36” Fire Water Main Line Piping Design. | Completed |
| 97 | 2010 | BUNGE Gıda A.Ş. | Preliminary Design of Single Line Diagram. | Completed |
| 98 | 2010 | ÇINAR İnşaat | Eldorada Gold – Efem Çukuru Facility North Portal Stormwater Drainage Design. | Completed |
| 99 | 2010 | ÇINAR İnşaat | Eldorada Gold – Efem Çukuru Facility Stormwater Generation Channel Project Revisions. | Completed |
| 100 | 2010 | MİLANGAZ | Tüpraş Refinery , Milangaz Facility, 10” Pipe Line Expansion Calculations. | Completed |
| 101 | 2010 | HT Mühendislik | Çakmaktepe Power Plant, Phase 3 Mechanical Design Works. | Completed |
| 102 | 2010 | HT Mühendislik | Pancar Energy Power Plant , Mechanical Design. | Completed |
| 103 | 2010 | HT Mühendislik | MOSB Energy Power Plant , Engineering Design of 16” Steam Collector. | Completed |
| 104 | 2010 | HT Mühendislik | MOSB Energy Power Plant , Pipe Bridge Design. | Completed |
| 105 | 2010 | HT Mühendislik | MOSB Energy Power Plant , Cooling Tower Pump Selection. | Completed |
| 106 | 2010 | HT Mühendislik | Çakmaktepe Power Plant , CT Platform Design. | Completed |
| 107 | 2010 | ORDİNAT İnşaat | EÜAŞ Ambarlı Power Plant, 600M3 Deminaralized and 600M3 Filtred Water Tank Design Revisions. | Completed |
| 108 | 2010 | RASA Enerji A.Ş. | Urfa Power Plant , Simple Cycle and Combined Cycle Mechanical Design. | Completed |
| 109 | 2010 | TERBAY-BAYALTON | Dalan Soap Manufacturing Facilities, Design of Storage ,Mixing and Reaction Tanks for Liquid and Solid Soap Divisions. | Completed |
| 110 | 2010 | TİRENDA Enerji Üretim A.Ş. | Tire Power Plant , Mechanical ve Constructional Design Works. | Completed |
| 111 | 2010 | PSG Mühendislik | EnerjiSA Bandırma Power Plant, Design of Service Water Lines. | Completed |
| 112 | 2010 | PSG Mühendislik | EnerjiSA Bandırma Power Plant , Engineering Design of Fire Water , Field Drainage , Oily Water Drainange and Waste Water Lines. | Completed |
| 113 | 2010 | TOTAL Oil Türkiye A.Ş. | Total – Menemen Mineral Oil Plant, Design of Relief Lines. | Completed |
| 114 | 2010 | TOTAL Oil Türkiye A.Ş. | İzmir – Aliağa Facility , 150M3 Tank Design. | Completed |
| 115 | 2010 | TOTAL Oil Türkiye A.Ş. | Total – Menemen Mineral Oil Plant, Design of Heating Oil Lines. | Completed |
| 116 | 2010 | TOTAL Oil Türkiye A.Ş. | İzmir – Aliağa Facility , Various Drawing Services . | Completed |
| 117 | 2010 | TOTAL Oil Türkiye A.Ş. | Total – Menemen Mineral Oil Plant, Base Oil Tank Serpentine Design. | Completed |
| 118 | 2010 | TOTAL Oil Türkiye A.Ş. | Aliağa Terminal ,Fire Water and Foam Piping Design of T03,T09 and T15 Tanks. | Completed |
| 119 | 2010 | WESTFALIA Separatör | Afyon TMO Alkoloid Factory , New Codein and Extraction Units Piping Design. | Completed |
| 120 | 2011 | BUNGE Gıda A.Ş. | Bunge – Doysan Factory Phase II Extension Project Periphery System Design Works. | Completed |
| 121 | 2011 | EF Enerji | Steam and Condensate Distribution Line Extension Design for MOSB. | Completed |
| 122 | 2011 | ENERSAN Mühendislik | Flokser Çerkezköy Factory , Design of Heating Oil Lines. | Completed |
| 123 | 2011 | ERAY YAPI | Poaş Aliağa Terminal Mechanical Design Works for Existing Pump Station. | Completed |
| 124 | 2011 | FETGAZ | Natural Gas Deodorizing Tank Detail Design. | Completed |
| 125 | 2011 | GEA Tuchenhagen | Platform Design. | Completed |
| 126 | 2011 | GEA Westfalia Seperator | DB Tarım Neutralisation Plant, Basic Layout and Piping Design. | Completed |
| 127 | 2011 | GEA Westfalia Seperator | Hama Oil Neutralisation Plant, Basic Layout and Piping Design. | Completed |
| 128 | 2011 | GEA Westfalia Seperator | Manisa OSB Sewage Treatment Plant, Design for Decanter Installation . | Completed |
| 129 | 2011 | HT Mühendislik | MOSB Desuperheater Line Expansion Calculations. | Completed |
| 130 | 2011 | HT Mühendislik | MOSB Expansion Calculations for Turbined Steam and Saturated Steam Lines. | Completed |
| 131 | 2011 | HT Mühendislik | Yeşilyurt Enerji Elektrik Üretim A.Ş. - Samsun Combined Cycle Plant Mecahanical Design Works. | Completed |
| 132 | 2011 | MAKBOSAN | Tüpraş Aliağa Refinery ,TK2681 ve TK2682 Spent Caustic Tank Facility Design. | Completed |
| 133 | 2011 | OMV Petrol Ofisi A.Ş. | Derince Mineral Oil Factory , Tank Storage Area Rehabilitation Design Works. | Completed |
| 134 | 2011 | OMV Petrol Ofisi A.Ş. | Derince Mineral Oil Factory , Fire Fighting System Rehabilitation Design Works. | Completed |
| 135 | 2011 | OMV Petrol Ofisi A.Ş. | Haramidere,Mersin,İskenderun and Aliağa Terminals, Fire Detection and Alarm System Design Works. | Completed |
| 136 | 2011 | OMV Petrol Ofisi A.Ş. | OMV Petrol Ofisi A.Ş. İskenderun, Haramidere, Derince, Antalya, Aliağa, Trabzon, Samsun, Kırıkkale, Yarımca Terminals and Derince Mineral Oil Factory Fire and Explosion Risk Evaluation Works. | Completed |
| 137 | 2011 | SİSTEMAS | NaCl Crystalisation Facility Evaparator and Interconnecting Piping Detail Design. | Completed |
| 138 | 2011 | TARKİM | Mustafa Kemalpaşa Factory, DME Unit Various Piping Design Works. | Completed |
| 139 | 2011 | TEKNİKER A.Ş. | Aliağa Refinary , TK3601 15000M3 Raw Water Tank Design. | Completed |
| 140 | 2011 | TOTAL Oil Türkiye A.Ş. | Gebze Facility , Hydraulic Calculations for T18 Tank Piping. | Completed |
| 141 | 2011 | TOTAL Oil Türkiye A.Ş. | Haramidere Terminal , Fire Fighting System Rehabilitation Design Works. | Completed |
| 142 | 2011 | TOTAL Oil Türkiye A.Ş. | Menemen Mineral Oil Factory , Various Piping Design Works. | Completed |
| 143 | 2011 | TOTAL Oil Türkiye A.Ş. | Menemen Mineral Oil Factory , Heating Coil Design for Tank S17. | Completed |
| 144 | 2011 | TOTAL Oil Türkiye A.Ş. | Menemen Mineral Oil Factory , Discharge Water Piping for the Water Sump. | Completed |
| 145 | 2011 | TOTAL Oil Türkiye A.Ş. | Haramidere Facility , Anchorage Calculations for Tank T08. | Completed |
| 146 | 2011 | TOTAL Oil Türkiye A.Ş. | Total Aliağa Terminal , Base Oil Tank Design for Product Change Project. | Completed |
| 147 | 2011 | TOTAL Oil Türkiye A.Ş. | Haramidere Terminal, P&ID Revision of Drawings for Process Lines. | Completed |
| 148 | 2011 | TOTAL Oil Türkiye A.Ş. | Aliağa Terminal , Basic and Detail Design of 2300M3 Diesel Tank. | Completed |
| 149 | 2011 | T.P.A.O. | Trakya Regional Office , 90M3 Fuel Tank Design. | Completed |
| 150 | 2011 | TÜPRAG-ELDORADO GOLD Cooperation | Efem Çukuru Gold Mine , Basic and Detail Engineering Services. | Completed |
| 151 | 2012 | ARAT Endüstri Ltd. Şti. | Detail Design For GCP (Gas Cleaning Plant) Reactor and Gas Ducts. | Completed |
| 152 | 2012 | ARAT Endüstri Ltd. Şti. | Ethanol Tank Design for Shell Kırıkkale Facility. | Completed |
| 153 | 2012 | ATEŞ Çelik | Acid Tanks and Loading Facility Design for Gördes Nickel Mine. | Completed |
| 154 | 2012 | ÇALIK Enerji | Nainawa Energy Power Plant Project - Iraq , Fire Pump Building Piping Design. | Completed |
| 155 | 2012 | ÇALIK Enerji | Al Khairat Energy Power Plant Project - Iraq , Fire Pump Building Piping Design. | Completed |
| 156 | 2012 | ÇALIK Enerji | Nainawa Energy Power Plant Project - Iraq , Piping Design for Field Fire Lines. | Completed |
| 157 | 2012 | ÇINAR İnşaat | Basic and Detail Engineering Services for TÜPRAG - Efem Çukuru Gold Mine. | Completed |
| 158 | 2012 | DOĞAN Teknolojik Ltd. | Tüpraş Aliağa Refinery , Modification Design for TK3004 Tank. | Completed |
| 159 | 2012 | ENİSA Group | KAR Refinery Iraq , 2X25000M3 Raw Oil Tanks Design. | Completed |
| 160 | 2012 | ENİSA Group | Tüpraş Refinery ,Warehouse Roof and Administrative Building Roof Calculations and Detail Engineering. | Completed |
| 161 | 2012 | ERAY YAPI | POAŞ Mersin Terminal , Foam Collector Revision Design. | Completed |
| 162 | 2012 | GEA Process Mühendislik | Various Platform and Construction Steel Design. | Completed |
| 163 | 2012 | GEA WESTFALIA Seperator | 3D Modelling Design for AVES Vegetable Oil Multi Process Line. | Completed |
| 164 | 2012 | GEA WESTFALIA Seperator | Revision Works of Trakya Birlik Tank Projects. | Completed |
| 165 | 2012 | GEMONT A.Ş. | Various Pressure Vessel and Intake Air Stack Design for Erdemir No 7 Air Seperation Plant. | Completed |
| 166 | 2012 | GÖKÇE Çelik | Fire System Project Revisions for OMV POAŞ Derince Facility. | Completed |
| 167 | 2012 | HAVATEK A.Ş. | Nylon and Thuwal Saudi Arabia Projects, Detail Engineering of the Tanks. | Completed |
| 168 | 2012 | HAVATEK A.Ş. | Bina Bawi – Iraq Project, Water and Oil Splitter Detail Engineering. | Completed |
| 169 | 2012 | HAVATEK A.Ş. | Bina Bawi – Iraq Project, Flare Gas Vessel and 2.nd Stage Seperator Detail Engineering. | Completed |
| 170 | 2012 | HAVATEK A.Ş. | Bina Bawi – Iraq Project, Prismatic Oil and Water Tank Detail Engineering. | Completed |
| 171 | 2012 | HAVATEK A.Ş. | 20000M3 HFO Tank Roof Calculations. | Completed |
| 172 | 2012 | HT Mühendislik | Antalya OSB Buket Pipe Line Thermal Design. | Completed |
| 173 | 2012 | HT Mühendislik | Keskinoğlu New Pasteurizing Building Design for Mechanical Works. | Completed |
| 174 | 2012 | İZMİR Mühendislik | Tüprag Gold Mine , Ore Bin Hatch Design. | Completed |
| 175 | 2012 | ISIMSAN | FEM Analysis for Mixer Flange. | Completed |
| 176 | 2012 | MEGA Endüstri | POAŞ Derince Facility, Fire System As-Built Drafting Works. | Completed |
| 177 | 2012 | MEGE Elektrik Üretim A.Ş. | Dora III Jeothermal Power Plant , Pressure Vessel Design. | Completed |
| 178 | 2012 | Mondi Tire Kutsan | Piping Design of New Equipments for Paper Paste Unit. | Completed |
| 179 | 2012 | OMV Petrol Ofisi A.Ş. | Mersin Terminal , Design for Fire System Modification Works. | Completed |
| 180 | 2012 | OMV Petrol Ofisi A.Ş. | As-Built Drafting Works for Aliağa Terminal Fuel Lines. | Completed |
| 181 | 2012 | PSG Mühendislik | Urfa ODAŞ Power Plant , Combined Cycle Mechanical Design. | Completed |
| 182 | 2012 | PSG Mühendislik | Dora III Jeothermal Power Plant , Piping Desing for Production Well to Plant Area. | Completed |
| 183 | 2012 | SARTA Müh Mimarlık | Various Platform Design for JTI. | Completed |
| 184 | 2012 | SUN Chemical | SS Tank Design for Gülsan. | Completed |
| 185 | 2012 | SUN Chemical | As-Built P&ID Drafting Work for İzmir Factory PU and Solvent System. | Completed |
| 186 | 2012 | TARİŞ Zeytinyağı A.Ş. | 4X500M3 Olive Oil Storage Tank Facility Design. | Completed |
| 187 | 2012 | TARKİM | As-Built Drafting Works For M.Kemalpaşa Factory. | Completed |
| 188 | 2012 | TUZLA Jeotermal A.Ş. | Tuzla Jeothermal Power Plant As-Built Drafting Works. | Completed |
| 189 | 2012 | TÜPRAG-ELDORADO GOLD Cooperation | Efem Çukuru Gold Mine , Basic and Detail Engineering Services. | Completed |
| 190 | 2012 | TÜPRAŞ | Aliağa Refinery , Various Piping Calculation Works. | Completed |
| 191 | 2012 | TP Dağıtım A.Ş. | Bioethanol Injection System Design for Dörtyol , İzmit and Kırıkkale Terminals. | Completed |
| 192 | 2012 | TOTAL Oil Türkiye A.Ş. | Textile Oil Tank , Piping and Detail Engineering Works. | Completed |
| 193 | 2012 | TOTAL Oil Türkiye A.Ş. | Design for Relocation of Fire Piping Lines for Menemen Facility. | Completed |
| 194 | 2012 | TOTAL Oil Türkiye A.Ş. | Aliağa Terminal Modification Works on As-Built Drawings. | Completed |
| 195 | 2012 | TOTAL Oil Türkiye A.Ş. | Ethanol Biodiesel Injection System and Loading Automation Design for Aliağa Terminal. | Completed |
| 196 | 2012 | TOTAL Oil Türkiye A.Ş. | Total Gas Aliağa Terminal, Design for Fire Fighting System Modification Works. | Completed |
| 197 | 2012 | TOTAL Oil Türkiye A.Ş. | Total Aliağa Terminal , Modification of Product Change Projects. | Completed |
| 198 | 2012 | TOTAL Oil Türkiye A.Ş. | Bioethanol Injection System Design for Haramidere Terminal. | Completed |
| 199 | 2012 | TOTAL Oil Türkiye A.Ş. | Aliağa Terminal , Fuel Line As-Built Drafting Works. | Completed |
| 200 | 2012 | TOTAL Oil Türkiye A.Ş. | Aliağa Terminal , Water Collecting System Capacity Calculations. | Completed |
| 201 | 2013 | AKSA Enerji | Manisa Power Plant , Steam System Rehabilitation Design Works. | Completed |
| 202 | 2013 | AKSA Enerji | Consuldation Of Licence File for Power Plant Ministerial Permits. | Completed |
| 203 | 2013 | AMBARLI Ltd. Şti. | Various Design Works for Ambarlı Terminal. | Completed |
| 204 | 2013 | ALARKO Taahhüt Grubu | Material Bugdeting Study of Tanks for Bozhakol – Kazakhistan Copper Project. | Completed |
| 205 | 2013 | Arkemmak | Maren Energy , Seperator Tank Design. | Completed |
| 206 | 2013 | BİMSAN Boru | Tüpraş – İzmit Refinery ,Waste Water Tanks Design for RUP Project. | Completed |
| 207 | 2013 | DOĞAN Teknolojik Ltd. | TÜPRAŞ Batman Refinery , Waste Water Treatment Unit Balance Tankage System Design. | Completed |
| 208 | 2013 | DOĞAN Yangın A.Ş. | TÜPRAŞ Aliağa Refinery , Fire Fighting System , Sea Water Supply Design Works. | Completed |
| 209 | 2013 | DOĞAN Yangın A.Ş. | TÜPRAŞ Batman Rafinery , Fire Fighting System Rehabilitation Design Works. | Completed |
| 210 | 2013 | EFOR Makine | Yunus Emre Power Plant , Auxillary Boiler and Heat Exchanger Station Mechanical Design Works. | Completed |
| 211 | 2013 | EFOR Makine | Yunus Emre Power Plant , Fuel Station Mechanical Design Works. | Completed |
| 212 | 2013 | EFOR Makine | Yıldızlar Dedeli Power Plant, Deaerator and BFW Tank Design. | Completed |
| 213 | 2013 | ERAY YAPI | OPET Aliağa Terminal, Tank Farm Revamp Design Works. | Completed |
| 214 | 2013 | HAVATEK A.Ş. | Thuwal Project , Platform Design for Tanks | Completed |
| 215 | 2013 | LOTUS Enerji | Turkmenbashi Refinery, New DCU-SDU Unit Off Site Area Design Works. | Completed |
| 216 | 2013 | MB Teknik | Process and Fire Fighting Piping Design for BP Diyarbakır Terminal. | Completed |
| 217 | 2013 | MİMAŞ A.Ş | AGOCO – Libya , 6-Sloats Manuel Manifold Static Calculation Works. | Completed |
| 218 | 2013 | OMV Petrol Ofisi A.Ş. | Samsun Terminal , Stormwater Stream Rehabilitation Design Works. | Completed |
| 219 | 2013 | OMV Petrol Ofisi A.Ş. | Aliağa Terminal , Additive Injection System Design. | Completed |
| 220 | 2013 | SUN Chemical | ALOSBİ Factory Basic Design. | Completed |
| 221 | 2013 | TÜPRAŞ | Tüpraş Batman Refinery , Plant-120 Unit 3D Modelling and As-Built Drafting Works. | Completed |
| 222 | 2013 | TPPD | Dörtyol Storage Facility , Various Engineering Services. | Completed |
| 223 | 2013 | TPPD | Biodiesel Injection System Design for Dörtyol , Kırıkkale and Körfez Terminals. | Completed |
| 224 | 2014 | ARK İnşaat | Çeşme Setur Marina, Mechanical Design Works. | Completed |
| 225 | 2014 | AKSA Enerji | AKSA Cyprus - Kalecik Power Plant, DeSOx Gas Connection Channels Detail Engineering. | Completed |
| 226 | 2014 | AVM Metal | Turkmenbashi Refinery, Vacuum Residue Tank Design. | Completed |
| 227 | 2014 | DOĞAN YANGIN Sist. | İzmit Refinery, Fire Fighting System Design for New Cokery Area. | Completed |
| 228 | 2014 | ENPRO | Boufarik Algeria, 704MW Power Plant Fuel and Water Tanks Design. | Completed |
| 229 | 2014 | GEMSAN | Petkim, Infrastructure Detail Engineering for New Naptha Tanks. | Completed |
| 230 | 2014 | GİMAS | Pressure Vessel Design. | Completed |
| 231 | 2014 | Linde Gaz | 20" CO2 Line Design for Saraykoy Denizli Factory. | Completed |
| 232 | 2014 | Mimaş | Heat Exchanger Design. | Completed |
| 233 | 2014 | MB Teknik | Dogu Karasal Diyarbakır Facility, Ethanol Injection System Design. | Completed |
| 234 | 2014 | OPET | OPET Korfez Facility Extension Works, Mechanical and Civil Design. | Completed |
| 235 | 2014 | ORBAY End. | Reactor Jacket Air Recycling System Design for Petkim AYPE1-2 Factory. | Completed |
| 236 | 2014 | RAVAGO Petro Kimya Üretim A.Ş. | New Pentane Storage Facility Design for ALOSBI Factory. | Completed |
| 237 | 2014 | RAVAGO Lojistik Hizmetleri A.Ş. | 18.000 M3 Styrene - Aliaga Storage Facility Design. | Completed |
| 238 | 2014 | SUN Chemical | ALOSBİ Factory Detail Design. | Completed |
| 239 | 2014 | TARKİM | Mustafa Kemalpaşa Factory, Design Works for DME Tanks Relocation. | Completed |
| 240 | 2014 | TARKİM | Mustafa Kemalpaşa Factory, Design Works for Renovation of Fire Fighting System. | Completed |
| 241 | 2014 | Tuzla Jeotermal Enerji A.Ş. | Consultancy and Actual Design Status Reporting Works for Tuzla JES Power Plant. | Completed |
| 242 | 2014 | TOTAL Oil Türkiye A.Ş. | Aliaga Facility, P&ID Updating Works. | Completed |
| 243 | 2014 | TPPD | Fuel Loading / Unloading System Design for Ambarlı TPPD Facility. | Completed |
| 244 | 2014 | VEOLIA Water Solutions | Process Water Treatment Facility Tank Design for Modern Karton. | Completed |
| 245 | 2015 | DYO Inks | DYO Inks Manisa Factory, PFD and P&ID Drawing Works. | On Going Pr. |
| 246 | 2015 | ERAY YAPI | OMV POAŞ Airport Terminal P&ID Drawings; For İstanbul , İzmir , Ankara , Antalya , Dalaman and Bodrum Terminals. | On Going Pr. |
| 247 | 2015 | ERAY YAPI | Fuel Loading Area Design for OMV POAŞ Aliağa and Antalya Facilities. | Completed |
| 248 | 2015 | ERAY YAPI | Ethanol Tank Design for OMV POAŞ Antalya Facility. | Completed |
| 249 | 2015 | ERAY YAPI | As-Built P&ID Drawings for THY-OPET JV İstanbul Atatürk Airport Fuel Loading Facility. | Completed |
| 250 | 2015 | EXERGY | Steam Ejector Design. (Calculations-Design-Detailed Design) | Completed |
| 251 | 2015 | GEA WESTFALIA Separatör | PFD and P&ID Drawings and Basic Design of Process Tanks for Unat Project. | Completed |
| 252 | 2015 | FENER Mekanik | P&ID Modification Works for OMV POAŞ Aliağa Facility. | Completed |
| 253 | 2015 | FENER Mekanik | Fuel Loading Area Design for OMV POAŞ Aliağa Facilities. | Completed |
| 254 | 2015 | TARKİM | Basic and Detailed Mechanical Design for TARKİM Mustafakemalpaşa Methoxy-Methane Production Facility. | On Going Pr. |
| 255 | 2015 | TOTAL Oil Türkiye A.Ş. | Design for Fire Fighting System Modification Works for TOTAL Oil Aliağa Terminal. | On Going Pr. |
| 256 | 2015 | TOTAL Oil Türkiye A.Ş. | Hydraulics Calculations and As-Built Drawing Works for Menemen Mineral Oil Factory. | Completed |
| 257 | 2015 | TOTAL Oil Türkiye A.Ş. | PFD Drawings of Counters and As-Built Drawings of 6 Counter Lines for Menemen Mineral Oil Factory. | Completed |
| 258 | 2015 | TOTAL Oil Türkiye A.Ş. | Inspection of Present Tank Breather Calculations. | Completed |
| 259 | 2015 | TOTAL Oil Türkiye A.Ş. | Modifications of Fire Water System of LPG Tanks For Aliağa Terminal. | Completed |
| 260 | 2015 | TUZLA Jeotermal A.Ş. | Silencer Design For TUZLA Geothermal Plant. | Completed |
| 261 | 2015 | TUZLA Jeotermal A.Ş. | Silencer Fabrication and Installation For TUZLA Geothermal Plant. | On Going Pr. |
| 262 | 2015 | OPET | Hydraulics Analysis and Detailed Engineering of Measurement Skid For OPET Marmara Ereğlisi Facility. | On Going Pr. |
| 263 | 2015 | OPET | Hydraulics Analysis and Detailed Engineering of Measurement Skid For OPET Mersin Facility. | On Going Pr. |